Trade Measures
The numbers you work out on a scrap of ply - buckets per cube, bags per pour, sheets per wall, beads per cartridge. All budget figures: your product's data sheet and the drawings win.
🪣 Buckets & barrows per m³
Volume (m³)
10 L / 15 L / 20 L buckets · 65 L standard barrow, 100 L big barrow. Heaped loads carry more - these are struck-level.
🪨 Concrete by the bag
Volume (m³)
20 kg premix yields ≈ 0.0092 m³ (≈108 bags per m³). Over ~0.5 m³, order a mini-mix truck - your back will thank you.
⚗ Mix ratios by bucket
MixBuckets of cement
Same bucket for everything, struck level. Yield ≈ 2/3 of combined dry volume once mixed and compacted.
🎨 Paint
Area (m²)CoatsCoverage
Cans: 1 L / 4 L / 10 L. New plasterboard needs its sealer coat first.
🪤 Tiles + adhesive + grout
Area (m²)Tile sizeWaste
Adhesive ≈ 3.5 kg/m² (6 mm notch; double for 10 mm/large format). Grout by the standard joint formula at 3 mm joints.
Sheets are 1200 wide - plasterboard is ordered by the lineal metre. Pick a sheet length that covers the wall height in one, or you have added a horizontal butt joint to set and sand. Screws ≈ 30/sheet on walls · stud adhesive 1 tube per 2-3 sheets · base + top compound ≈ 0.5 kg/m². Includes 7% cut waste. Confirm sheet availability with your supplier.
🧱 Render
Area (m²)Thickness
1 : 4 mix · wet volume + 25% for waste/suction. Sand ≈ 1.6 t/m³, cement ≈ 8 bags (20 kg) per m³ of render.
🪖 Decking boards
Deck area (m²)Board
Lineal metres incl. 10% waste · 2 screws per board per joist, joists at 450 crs.
🔭 Skirting & architrave
Room perimeter (m)Doorways
Skirting = perimeter − 0.9 m per doorway + 10%. Architrave ≈ 5.2 LM per single door (both sides).
💧 Silicone & sealant
Joint length (m)Bead
300 ml cartridge. 6 mm bead ≈ 10.6 m, 10 mm ≈ 3.8 m, 12 mm ≈ 2.6 m per cartridge.
🌡 Insulation batts
Area (m²)Coverage per pack
Coverage varies by brand and stud spacing - check the pack label; 5% waste included.
🌱 Soil, mulch & turf
Area (m²)Depth
Turf counted as 1 m² slabs +5% waste (roll sizes vary by supplier - divide by your roll's m²). Soil ≈ 1.4 t/m³, mulch ≈ 1.2 t/m³.
🚶 Ramp gradient checker
Rise (mm)Run (mm)
Accessible walkway 1:20 · access ramp max 1:14 (AS 1428.1) · kerb ramp 1:8 short only. Verify against the standard and your certifier.
🪛 Stair rise & going
Total rise (mm)Going per tread (mm)
NCC (houses): riser 115-190 mm, going 240-355 mm, 2R+G between 550-700. Check your class of building and the certifier's word is final.
The tools above are free and yours to use. When you need the paperwork behind them reviewed by someone who has run sites, Obras HSE Services is a live consulting business in south-east Queensland.
SWMS review service — a marked-up review showing what is missing and why it matters.