Real documents you keep — not sample pages and not watermarked previews. Print them, stick them on the shed wall, use them Monday.
Take what's useful and decide for yourself whether the rest is worth paying for.
Nothing to start · nothing to cancel · nothing expiresA complete controlled Obras SWMS sample in editable Word and print-ready PDF, Australia-wide edition, headed for your own company. It carries the Obras QR band — scan it and you see the controlled revision and its release state. The sample is being updated to the Australia-wide standard; leave your email and it is sent on release.
The walk before 7am, in the order it actually happens — people, work fronts, plant, documents, and the blockers you write down before you leave the walk.
Download PDFTen minutes with the crew before anyone picks up a tool. The day, what changed, today's hazards, controls confirmed, and whether everyone is fit for work.
Download PDFOnce the truck starts, every mistake is permanent. Reo, cover, embeds, formwork and backprops, post-tensioning, hold points, then the logistics.
Download PDFThe weekly walk, written to find things rather than tick boxes. Access and edges, plant and traffic, services, health hazards, emergency — and closing findings out.
Download PDFIs the one in your folder current, correct for your jurisdiction and actually signed? Includes which Act applies in each state — Victoria is not the WHS Act.
Download PDFThe floor cycle gate. Structure below, survey and set-out, core and climb, edge and access, services and logistics, and the QA gates for the level.
Download PDFAudit your own folder before somebody else does. The records an auditor asks for by name — including the subcontractor insurance nobody checks.
Download PDFPractical completion and handover, in the order it gets asked for. Defects, certificates, commissioning, O&M and warranties, records, and the handover itself.
Download PDFStanding up a new site — fencing, amenities, services, emergency arrangements and first aid. Part of the Site Setup Pack, and the QR signage that goes with it.
See the site toolsThese are the checklists. They're genuine prompt lists you can use as they are, and they're free to share around your crew.
They are not compliance documents and they are not legal advice. They carry no risk assessment, no control measures, no sign-off block and no QR control record — those are what the paid documents add. Where work is high-risk construction work, a SWMS prepared in consultation with the workers doing the work and approved by a competent person is required before work starts.
Adapt everything here to your own site, plant, crew and jurisdiction.
Every Obras document carries a QR band that resolves to a live control record — current approved revision, approval status, owner and sign-offs — and flags a superseded copy as superseded. 300 Australia-wide SWMS — one national core, the jurisdiction resolved on the cover — plus permits, registers, management plans and full operating systems.
Latest controlled SWMS version — Master Rev 22 ยท completed and verified 4 October 2026.
Obras Onsite Pty Ltd · ABN 54 698 828 821 · Australian owned · Gold Coast, QLD. General information, not legal advice. A SWMS is compliant once you tailor it to your actual site, task and controls and have a competent person approve it before work starts.
The tools above are free and yours to use. When you need the paperwork behind them reviewed by someone who has run sites, Obras HSE Services is a live consulting business in south-east Queensland.