Trade pack · 300 Australia-wide SWMS

Access, Scaffold & Working at Height

16 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

FAM-0116 SWMS427 pages14 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
$149Trade pack · GST included · one-time
Lifeline Systems Installation SWMS cover
Lifeline Systems Installation — one of the 16 SWMS in this pack

What is in the pack

OBR-SWMS-0043-AU · Rev A · HRCW

Lifeline Systems Installation

$19.90View →
OBR-SWMS-0044-AU · Rev A · HRCW

Roof Access and Anchor Systems

$19.90View →
OBR-SWMS-0046-AU · Rev A · HRCW

Safety Net Installation

$19.90View →
OBR-SWMS-0047-AU · Rev A · HRCW

Height Rescue

$19.90View →
OBR-SWMS-0048-AU · Rev A · HRCW

Rope Access

$19.90View →
OBR-SWMS-0049-AU · Rev A · HRCW

Swing Stage Operations

$19.90View →
OBR-SWMS-0050-AU · Rev A · HRCW

Mast Climber Operations

$19.90View →
OBR-SWMS-0051-AU · Rev A · HRCW

Skylight Installation

$19.90View →
OBR-SWMS-0052-AU · Rev A · HRCW

Fragile Roof and Skylight Protection

$19.90View →
OBR-SWMS-0179-AU · Rev A

Mobile Scaffold Tower Operations

$19.90View →
OBR-SWMS-0180-AU · Rev C

Ladders, Trestles and Low-level Work Platforms

$19.90View →
OBR-SWMS-0181-AU · Rev C · HRCW

Facade Access and Building Maintenance Unit Operations

$19.90View →
OBR-SWMS-0182-AU · Rev C · HRCW

Overhead Protection Gantry Construction

$19.90View →
OBR-SWMS-0183-AU · Rev C · HRCW

Ceiling and Roof Space Access (all trades)

$19.90View →
OBR-SWMS-0184-AU · Rev C · HRCW

Temporary Roofs and Encapsulation (shrink wrap)

$19.90View →
OBR-SWMS-0185-AU · Rev C · HRCW

Telecommunication Tower Climbing and Rigging

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page