The QR Gateway · the core of Obras Onsite

One scan from a PDF to the truth.

Every Obras Onsite document sits behind a QR gateway. A crew scans it on site and doesn't get a PDF — they get the current controlled revision and its release status — whether the copy in their hands is the current revision, a superseded one, or not a controlled Obras document at all.

The gateway in action

Scan it. Watch it become a decision.

One QR — document identity, revision and current controlled status. Auto-playing, no sign-up.

Scan

Scan the QR

On any Obras doc, sign or asset

Verify

Verifying…

Current? Approved? Site-specific?

Verified
✓

Document verified

SWMS — Concrete Pour · Rev 2.1

Evidence captured · register updated
Decision
12GREEN
3AMBER
1RED

Cleared to proceed

Level 14 pour — all controls met

  • 1ScanThe QR on the deck — phone camera, no app.
  • 2VerifyObras checks it's current, approved and site-specific.
  • 3Capture & recordEvidence captured, the register updates itself.
  • 4DecideIt rolls to one verdict: Green, Amber or Red.
This one is real — scan it right now Point your phone camera at it. It opens the live control gateway for DCB-001 · Daily Control Board — current revision, status, evidence. No app, no sign-up. Or use the in-browser scanner ↗

Why QR verification matters

A printed document is out of date the moment it leaves the printer. A scanned document tells you the truth, every time.

Traditional documents

  • Printed
  • Outdated the moment it’s issued
  • No visibility of status
  • Built off a superseded sheet
  • Evidence assembled the night before audit
vs

Obras QR verification

  • Scan
  • Verify — current approved revision
  • Green / Amber / Red status
  • Evidence, registers, dashboard
  • Decision — proceed, review or stop

From document to verification

Document → QR → Gateway → controlled status. Every product, every division, the same chain.

01
Document
SWMS, drawing, ITP, permit, register — any controlled doc
→
02
QR Code
Printed on every document, scannable at the point of work
→
03
Gateway
Resolves to the live control record — not a PDF
→
04
Current Revision
Green current, Red superseded — never build off the wrong sheet
→
05
Approval & Evidence
Approved by, date, sign-offs, inspection records, photos
→
06
Register & Dashboard
Linked registers and the live Green/Amber/Red board
→
07
Operating System
One verified source of truth, deck to boardroom

What a scan shows you

The QR doesn’t open a file. It opens the live control record around it.

✓ GREEN · CURRENT

Pre-Pour Gate System

HSD-PPG · Rev A · v1.0
StatusCurrent · approved
Current revisionRev A
Approval dateOn issue (controlled)
Approved byStructural Foreman / Engineer
Hold pointsReo · Form · Survey · Sign-off
EvidencePhotos · cylinders · ITP
RelatedPour Order · Reo · Concrete
Green / Amber / RedOne verdict: proceed, review, or stop — do not use.
Current revisionThe approved rev, with a superseded warning if you’re behind.
Approval & sign-offApproved by, date, and the sign-off chain.
Evidence photosConcealed services, inspections and pour records attached.
Inspection recordsITP status, witness and hold points, NCRs.
Hold pointsWhat’s open and blocking work, with the owner.
Register linksThe live registers the document feeds.
Dashboard linksStraight to the Control Room board around it.
Version historyEvery revision — what changed, when, by whom.
Related documentsThe connected controls in the same system.
▤ Scan this live gateway →

QR-verified in every division

The same gateway sits behind every product, across all five divisions. Scan. Verify. Control.

▤ Compliance
▤ Commercial
▤ Residential
▤ High-Rise
▤ Leadership

Where this goes

Today the QR verifies a document: its identity, its revision and its current controlled status. The same stable identity is what later Obras software will read, which is why codes already printed on issued documents will not need replacing.

1
Document LibraryControlled documents, built by construction professionals.
2
QR SystemEvery document verified at the point of work — Green/Amber/Red.
3
Dashboard SystemRegisters and Control Rooms rolled to one daily verdict.
4
Construction Operating SystemOne verified source of truth that runs the job, deck to boardroom.

Scan. Verify. Control.

Put the QR gateway over your own job. Every drawing, SWMS, permit and register becomes one verified Green / Amber / Red decision at the point of work — on top of the systems you already use.

▶ See it run Scan a live gateway Enterprise licensing