Trade pack · 300 Australia-wide SWMS

Carpentry, Fit-out & Finishes

25 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

FAM-0525 SWMS567 pages18 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
$149Trade pack · GST included · one-time
Glazing and Facade Installation SWMS cover
Glazing and Facade Installation — one of the 25 SWMS in this pack

What is in the pack

OBR-SWMS-0087-AU · Rev A · HRCW

Glazing and Facade Installation

$19.90View →
OBR-SWMS-0088-AU · Rev A · HRCW

Insulation Installation

$19.90View →
OBR-SWMS-0089-AU · Rev A · HRCW

Wall Cladding and Facade Sheeting

$19.90View →
OBR-SWMS-0090-AU · Rev A

Flooring Installation

$19.90View →
OBR-SWMS-0091-AU · Rev A

Joinery, Doors and Cabinet Installation

$19.90View →
OBR-SWMS-0092-AU · Rev A

Decking and Pergola Construction

$19.90View →
OBR-SWMS-0239-AU · Rev C · HRCW

Roof Framing and Trusses

$19.90View →
OBR-SWMS-0240-AU · Rev C · HRCW

Floor Framing and Subfloor Construction

$19.90View →
OBR-SWMS-0241-AU · Rev C · HRCW

Stair and Balustrade Installation (timber and steel)

$19.90View →
OBR-SWMS-0242-AU · Rev C · HRCW

Site Cutting Station

$19.90View →
OBR-SWMS-0243-AU · Rev C · HRCW

Floor Screeding and Levelling

$19.90View →
OBR-SWMS-0244-AU · Rev C · HRCW

Waterproofing and Tanking

$19.90View →
OBR-SWMS-0245-AU · Rev C · HRCW

Suspended Ceiling Grid and Tile Installation

$19.90View →
OBR-SWMS-0246-AU · Rev C · HRCW

Access Flooring Installation

$19.90View →
OBR-SWMS-0247-AU · Rev C

Glazed Partition Installation

$19.90View →
OBR-SWMS-0248-AU · Rev C · HRCW

Signage Installation

$19.90View →
OBR-SWMS-0249-AU · Rev C · HRCW

AAC (Autoclaved Aerated Concrete) Panel Installation

$19.90View →
OBR-SWMS-0250-AU · Rev C · HRCW

Fire-rated Intertenancy Wall Construction

$19.90View →
OBR-SWMS-0251-AU · Rev C

Operable and Acoustic Wall Installation

$19.90View →
OBR-SWMS-0252-AU · Rev C · HRCW

Pallet Racking and Storage System Installation

$19.90View →
OBR-SWMS-0253-AU · Rev C · HRCW

Mezzanine Floor Installation

$19.90View →
OBR-SWMS-0254-AU · Rev A · HRCW

Window and External Door Installation (framed)

$19.90View →
OBR-SWMS-0255-AU · Rev A · HRCW

Timber and Weatherboard Cladding Installation

$19.90View →
OBR-SWMS-0256-AU · Rev A

Builders Clean (final construction clean)

$19.90View →
OBR-SWMS-0299-AU · Rev B

Industrial and Commercial Kitchen Fit-out

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page