Trade pack · 300 Australia-wide SWMS

Civil & Underground Services

36 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

FAM-0336 SWMS874 pages33 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
$149Trade pack · GST included · one-time
Bulk Earthworks SWMS cover
Bulk Earthworks — one of the 36 SWMS in this pack

What is in the pack

OBR-SWMS-0070-AU · Rev A · HRCW

Bulk Earthworks

$19.90View →
OBR-SWMS-0071-AU · Rev A

Dewatering

$19.90View →
OBR-SWMS-0072-AU · Rev A

Shoring and Retention Systems

$19.90View →
OBR-SWMS-0073-AU · Rev A

Rock Excavation

$19.90View →
OBR-SWMS-0074-AU · Rev A · HRCW

Soil Stabilisation

$19.90View →
OBR-SWMS-0075-AU · Rev A · HRCW

Underground Services Pipe Laying

$19.90View →
OBR-SWMS-0076-AU · Rev A · HRCW

Pits and Manholes Construction

$19.90View →
OBR-SWMS-0077-AU · Rev A · HRCW

Culvert Installation

$19.90View →
OBR-SWMS-0078-AU · Rev A · HRCW

Trenchless Pipe Installation

$19.90View →
OBR-SWMS-0079-AU · Rev A · HRCW

Kerb and Channel Construction

$19.90View →
OBR-SWMS-0080-AU · Rev A · HRCW

Asphalt Paving

$19.90View →
OBR-SWMS-0081-AU · Rev A · HRCW

Spray Sealing

$19.90View →
OBR-SWMS-0082-AU · Rev A · HRCW

Line Marking

$19.90View →
OBR-SWMS-0084-AU · Rev A · HRCW

Swimming Pool and Spa Construction

$19.90View →
OBR-SWMS-0116-AU · Rev C · HRCW

Horizontal Directional Drilling

$19.90View →
OBR-SWMS-0117-AU · Rev C · HRCW

Sheet Piling

$19.90View →
OBR-SWMS-0118-AU · Rev C · HRCW

CFA and Bored Piling Rig Operations

$19.90View →
OBR-SWMS-0119-AU · Rev A · HRCW

Driven Piling

$19.90View →
OBR-SWMS-0120-AU · Rev A · HRCW

Screw Pile Installation

$19.90View →
OBR-SWMS-0121-AU · Rev A · HRCW

Pile Cropping and Cutting Down

$19.90View →
OBR-SWMS-0122-AU · Rev C · HRCW

Pile Load Testing

$19.90View →
OBR-SWMS-0123-AU · Rev C · HRCW

Diaphragm Wall Construction

$19.90View →
OBR-SWMS-0124-AU · Rev C · HRCW

Secant and Contiguous Pile Wall Construction

$19.90View →
OBR-SWMS-0125-AU · Rev C · HRCW

Underground Electrical Services (conduits, pits and cable hauling)

$19.90View →
OBR-SWMS-0126-AU · Rev C · HRCW

Concrete Testing and Sampling

$19.90View →
OBR-SWMS-0127-AU · Rev B · HRCW

Erosion and Sediment Control

$19.90View →
OBR-SWMS-0128-AU · Rev A · HRCW

Pavement Layer Construction (granular base and subbase)

$19.90View →
OBR-SWMS-0129-AU · Rev A · HRCW

Pipe Relining and Pipe Bursting (trenchless rehabilitation)

$19.90View →
OBR-SWMS-0130-AU · Rev B · HRCW

Gabion and Rock Mattress Construction

$19.90View →
OBR-SWMS-0131-AU · Rev A · HRCW

Ground Improvement (dynamic compaction and vibro stone columns)

$19.90View →
OBR-SWMS-0132-AU · Rev A · HRCW

Concrete Pavement Construction (slipform paver)

$19.90View →
OBR-SWMS-0133-AU · Rev A · HRCW

Tunnelling and Underground Excavation Works

$19.90View →
OBR-SWMS-0134-AU · Rev C · HRCW

Rainwater Tank and On-site Detention Tank Installation

$19.90View →
OBR-SWMS-0135-AU · Rev C · HRCW

Pipeline Construction (welded steel and HDPE)

$19.90View →
OBR-SWMS-0136-AU · Rev C · HRCW

Slope Stabilisation (rockfall mesh and drapery)

$19.90View →
OBR-SWMS-0137-AU · Rev D · HRCW

Geosynthetic Liner Installation

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page