Trade pack · 300 Australia-wide SWMS

Concrete, Formwork & Structure

35 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

FAM-0235 SWMS999 pages21 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
$149Trade pack · GST included · one-time
Temporary Edge Protection and Penetration Covers SWMS cover
Temporary Edge Protection and Penetration Covers — one of the 35 SWMS in this pack

What is in the pack

OBR-SWMS-0045-AU · Rev A · HRCW

Temporary Edge Protection and Penetration Covers

$19.90View →
OBR-SWMS-0053-AU · Rev A · HRCW

Precast and Tilt-up Concrete Erection

$19.90View →
OBR-SWMS-0054-AU · Rev A · HRCW

Structural Steel Erection

$19.90View →
OBR-SWMS-0055-AU · Rev A

Post-Tensioning

$19.90View →
OBR-SWMS-0056-AU · Rev A · HRCW

Jumpform Operations

$19.90View →
OBR-SWMS-0057-AU · Rev A · HRCW

Slipform Operations

$19.90View →
OBR-SWMS-0058-AU · Rev A

Falsework and Temporary Support Installation

$19.90View →
OBR-SWMS-0059-AU · Rev A · HRCW

Structural Alterations

$19.90View →
OBR-SWMS-0060-AU · Rev A

Structural Strengthening

$19.90View →
OBR-SWMS-0061-AU · Rev A

Concrete Repair and Injection

$19.90View →
OBR-SWMS-0062-AU · Rev A

Grouting Operations

$19.90View →
OBR-SWMS-0063-AU · Rev A

Shotcrete - Sprayed Concrete

$19.90View →
OBR-SWMS-0064-AU · Rev A

Concrete Grinding and Polishing

$19.90View →
OBR-SWMS-0065-AU · Rev A

Stonemasonry and Stone Cladding

$19.90View →
OBR-SWMS-0066-AU · Rev A

Retaining Wall Construction

$19.90View →
OBR-SWMS-0067-AU · Rev A

Ground Anchor Installation

$19.90View →
OBR-SWMS-0068-AU · Rev A

Post-Installed Anchors

$19.90View →
OBR-SWMS-0069-AU · Rev A

Expansion Joint Installation

$19.90View →
OBR-SWMS-0093-AU · Rev A · HRCW

Shed and Patio Construction

$19.90View →
OBR-SWMS-0138-AU · Rev B · HRCW

Suspended Slab Formwork — Conventional

$19.90View →
OBR-SWMS-0140-AU · Rev B · HRCW

Modular Deck Formwork Systems (table and flying forms)

$19.90View →
OBR-SWMS-0141-AU · Rev B · HRCW

Formwork Stripping and Back-propping

$19.90View →
OBR-SWMS-0142-AU · Rev B · HRCW

Stair Construction (in-situ and precast flights)

$19.90View →
OBR-SWMS-0143-AU · Rev B · HRCW

Deck Cleaning and Blow-down (compressor and blower)

$19.90View →
OBR-SWMS-0144-AU · Rev B · HRCW

Crane Loading Platforms (install, use and removal)

$19.90View →
OBR-SWMS-0145-AU · Rev B · HRCW

Metal Deck Sheeting (handling, installation and cutting)

$19.90View →
OBR-SWMS-0146-AU · Rev B · HRCW

Reinforcement Fixing — Suspended Elements (beams, columns, walls, slabs)

$19.90View →
OBR-SWMS-0147-AU · Rev D

Hold-Down Bolt and Cast-in Installation

$19.90View →
OBR-SWMS-0148-AU · Rev B · HRCW

Static Concrete Placing Boom Operations

$19.90View →
OBR-SWMS-0149-AU · Rev B · HRCW

Bridge Deck and Superstructure Works

$19.90View →
OBR-SWMS-0150-AU · Rev B · HRCW

On-site Precast and Tilt-up Panel Casting

$19.90View →
OBR-SWMS-0151-AU · Rev B

Light-Gauge Steel Framing

$19.90View →
OBR-SWMS-0152-AU · Rev B · HRCW

Mass Timber (CLT and Glulam) Erection

$19.90View →
OBR-SWMS-0153-AU · Rev B · HRCW

Industrial Floor Slab Construction (laser screed)

$19.90View →
OBR-SWMS-0154-AU · Rev A · HRCW

Underpinning and Foundation Remediation

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page