Trade pack · 300 Australia-wide SWMS

Demolition, Hazardous Materials & Environmental

10 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

FAM-1010 SWMS238 pages6 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
$149Trade pack · GST included · one-time
Hazardous Chemicals and Dangerous Goods Handling and Storage SWMS cover
Hazardous Chemicals and Dangerous Goods Handling and Storage — one of the 10 SWMS in this pack

What is in the pack

OBR-SWMS-0224-AU · Rev C · HRCW

Hazardous Chemicals and Dangerous Goods Handling and Storage

$19.90View →
OBR-SWMS-0257-AU · Rev B · HRCW

Asbestos Removal — Non-friable (Class B)

$19.90View →
OBR-SWMS-0258-AU · Rev B

Lead Paint Removal

$19.90View →
OBR-SWMS-0259-AU · Rev A · HRCW

Contaminated and Acid Sulfate Soil Handling

$19.90View →
OBR-SWMS-0260-AU · Rev A

Hazardous Waste Handling and Disposal

$19.90View →
OBR-SWMS-0261-AU · Rev A

Biohazard and Trauma Scene Clean-up

$19.90View →
OBR-SWMS-0262-AU · Rev A

Mould Remediation

$19.90View →
OBR-SWMS-0263-AU · Rev A · HRCW

Synthetic Mineral Fibre and Ceramic Fibre Removal

$19.90View →
OBR-SWMS-0264-AU · Rev A · HRCW

Nuclear Density Gauge Use

$19.90View →
OBR-SWMS-0265-AU · Rev A · HRCW

Underground Storage Tank Removal

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page