Trade pack · 300 Australia-wide SWMS

Electrical, Energy & Technology

20 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

FAM-0820 SWMS444 pages20 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
$149Trade pack · GST included · one-time
Temporary Power Installation SWMS cover
Temporary Power Installation — one of the 20 SWMS in this pack

What is in the pack

OBR-SWMS-0186-AU · Rev C · HRCW

Temporary Power Installation

$19.90View →
OBR-SWMS-0187-AU · Rev C · HRCW

Switchboard Installation and Positioning

$19.90View →
OBR-SWMS-0188-AU · Rev C · HRCW

Cable Tray and Support System Installation

$19.90View →
OBR-SWMS-0189-AU · Rev C · HRCW

Cable Hauling and Pulling

$19.90View →
OBR-SWMS-0190-AU · Rev C · HRCW

Electrical Testing, Verification and Commissioning

$19.90View →
OBR-SWMS-0191-AU · Rev A · HRCW

Test and Tag of Electrical Equipment

$19.90View →
OBR-SWMS-0192-AU · Rev C · HRCW

Isolation, Lockout and Tagout of Plant and Services

$19.90View →
OBR-SWMS-0193-AU · Rev C · HRCW

Rooftop Solar PV Installation

$19.90View →
OBR-SWMS-0194-AU · Rev C · HRCW

Solar Farm Installation

$19.90View →
OBR-SWMS-0195-AU · Rev C · HRCW

Battery Energy Storage System Installation

$19.90View →
OBR-SWMS-0196-AU · Rev C · HRCW

EV Charger Installation

$19.90View →
OBR-SWMS-0197-AU · Rev C · HRCW

Data and Communications Cabling

$19.90View →
OBR-SWMS-0198-AU · Rev A · HRCW

Data Centre Installations

$19.90View →
OBR-SWMS-0199-AU · Rev D · HRCW

Security and Access Control Systems Installation

$19.90View →
OBR-SWMS-0200-AU · Rev C · HRCW

Generator Set-up and Operation

$19.90View →
OBR-SWMS-0201-AU · Rev C · HRCW

Working Near Live Power (overhead and underground)

$19.90View →
OBR-SWMS-0202-AU · Rev C · HRCW

High Voltage Electrical Work

$19.90View →
OBR-SWMS-0203-AU · Rev C · HRCW

Substation and Transformer Installation

$19.90View →
OBR-SWMS-0204-AU · Rev C · HRCW

Overhead Powerline Construction

$19.90View →
OBR-SWMS-0205-AU · Rev C · HRCW

Street Lighting, Traffic Signal and Pole Installation

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page