Trade pack · 300 Australia-wide SWMS

Roads, Traffic & External Works

17 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

FAM-1217 SWMS409 pages13 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
$149Trade pack · GST included · one-time
Site Deliveries and Unloading SWMS cover
Site Deliveries and Unloading — one of the 17 SWMS in this pack

What is in the pack

OBR-SWMS-0266-AU · Rev B · HRCW

Site Deliveries and Unloading

$19.90View →
OBR-SWMS-0267-AU · Rev A · HRCW

Guardrail and Wire Rope Barrier Installation

$19.90View →
OBR-SWMS-0268-AU · Rev A

Permanent Fencing and Chainwire Installation

$19.90View →
OBR-SWMS-0269-AU · Rev A · HRCW

Paving (segmental and unit paving)

$19.90View →
OBR-SWMS-0270-AU · Rev B · HRCW

Road Signs and Street Furniture Installation

$19.90View →
OBR-SWMS-0271-AU · Rev A · HRCW

Working in or near Rail Corridors

$19.90View →
OBR-SWMS-0272-AU · Rev B · HRCW

Working Over or Near Water

$19.90View →
OBR-SWMS-0273-AU · Rev B · HRCW

Marine Structures Construction (wharves, jetties, pontoons)

$19.90View →
OBR-SWMS-0274-AU · Rev A · HRCW

Temporary Concrete Barrier Placement

$19.90View →
OBR-SWMS-0275-AU · Rev B · HRCW

Bridge Jacking and Bearing Replacement

$19.90View →
OBR-SWMS-0276-AU · Rev B · HRCW

Noise Wall and Acoustic Barrier Construction

$19.90View →
OBR-SWMS-0277-AU · Rev A · HRCW

Irrigation System Installation

$19.90View →
OBR-SWMS-0278-AU · Rev A · HRCW

Roadside Vegetation and Slope Mowing

$19.90View →
OBR-SWMS-0279-AU · Rev A

Synthetic Turf and Sports Surface Installation

$19.90View →
OBR-SWMS-0280-AU · Rev B

Playground Equipment Installation

$19.90View →
OBR-SWMS-0281-AU · Rev B

Pesticide, Herbicide and Termite Chemical Application

$19.90View →
OBR-SWMS-0297-AU · Rev B · HRCW

Heritage Facade Retention and Conservation Works

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page