Trade pack · 300 Australia-wide SWMS

Roofing, Façade & Glazing

15 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

FAM-1115 SWMS350 pages14 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
$149Trade pack · GST included · one-time
Insulated Panel (Coolroom and Sandwich Panel) Construction SWMS cover
Insulated Panel (Coolroom and Sandwich Panel) Construction — one of the 15 SWMS in this pack

What is in the pack

OBR-SWMS-0225-AU · Rev C · HRCW

Insulated Panel (Coolroom and Sandwich Panel) Construction

$19.90View →
OBR-SWMS-0226-AU · Rev C · HRCW

Louvres, Sunshades and Screens Installation

$19.90View →
OBR-SWMS-0227-AU · Rev C · HRCW

Abrasive Blasting

$19.90View →
OBR-SWMS-0228-AU · Rev C · HRCW

High-Pressure Water Jetting and Hydro-demolition

$19.90View →
OBR-SWMS-0229-AU · Rev C · HRCW

Exterior Painting

$19.90View →
OBR-SWMS-0230-AU · Rev C · HRCW

Industrial Protective Coatings Application

$19.90View →
OBR-SWMS-0231-AU · Rev C · HRCW

Passive Fire Spray Coatings (intumescent and vermiculite)

$19.90View →
OBR-SWMS-0232-AU · Rev C · HRCW

Garage, Roller and Sectional Door Installation

$19.90View →
OBR-SWMS-0233-AU · Rev C · HRCW

Membrane Roofing Installation

$19.90View →
OBR-SWMS-0234-AU · Rev C · HRCW

Re-roofing of Existing Buildings

$19.90View →
OBR-SWMS-0235-AU · Rev C · HRCW

Facade and Window Cleaning at Height

$19.90View →
OBR-SWMS-0236-AU · Rev C · HRCW

EIFS and Foam Cladding System Installation

$19.90View →
OBR-SWMS-0237-AU · Rev C

Masonry Cleaning (acid washing)

$19.90View →
OBR-SWMS-0238-AU · Rev C · HRCW

Shade Sail and Awning Installation

$19.90View →
OBR-SWMS-0300-AU · Rev B · HRCW

Green Roof and Roof Garden Construction

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page