Trade pack · 300 Australia-wide SWMS

Site Logistics & General Construction

12 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

FAM-0412 SWMS275 pages6 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
$149Trade pack · GST included · one-time
Vegetation Clearing, Tree Removal and Arborist Works SWMS cover
Vegetation Clearing, Tree Removal and Arborist Works — one of the 12 SWMS in this pack

What is in the pack

OBR-SWMS-0083-AU · Rev B · HRCW

Vegetation Clearing, Tree Removal and Arborist Works

$19.90View →
OBR-SWMS-0085-AU · Rev A

Temporary Fencing and Hoarding

$19.90View →
OBR-SWMS-0086-AU · Rev A

Survey and Set-out

$19.90View →
OBR-SWMS-0282-AU · Rev B · HRCW

Load Restraint and Road Transport of Materials

$19.90View →
OBR-SWMS-0283-AU · Rev B · HRCW

Site Sheds and Amenities Installation

$19.90View →
OBR-SWMS-0284-AU · Rev B · HRCW

Housekeeping and Waste Management

$19.90View →
OBR-SWMS-0285-AU · Rev B · HRCW

Materials Storage, Stacking and Laydown Areas

$19.90View →
OBR-SWMS-0286-AU · Rev B

Remotely Piloted Aircraft (drone) Operations on Site

$19.90View →
OBR-SWMS-0287-AU · Rev B

Remote and Isolated Work

$19.90View →
OBR-SWMS-0288-AU · Rev B

Chainsaw Operations (non-arborist)

$19.90View →
OBR-SWMS-0289-AU · Rev B

Powder-actuated (explosive power) Tool Operations

$19.90View →
OBR-SWMS-0290-AU · Rev B · HRCW

Conveyor System Installation

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page