Sector pack · 300 Australia-wide SWMS

Civil & Infrastructure

42 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

SEC-CIVIL42 SWMS1083 pages35 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
Licensed accessincluded with Company ($299/month) · Builder Pro ($129/month) carries up to 100 SWMS of your choice
General Excavation SWMS cover
General Excavation — one of the 42 SWMS in this pack

What is in the pack

OBR-SWMS-0013-AU · Rev A

General Excavation

$19.90View →
OBR-SWMS-0014-AU · Rev A · HRCW

Trenching over 1.5m

$19.90View →
OBR-SWMS-0015-AU · Rev A

Vacuum Excavation

$19.90View →
OBR-SWMS-0040-AU · Rev A · HRCW

Piling and Foundations

$19.90View →
OBR-SWMS-0066-AU · Rev A

Retaining Wall Construction

$19.90View →
OBR-SWMS-0067-AU · Rev A

Ground Anchor Installation

$19.90View →
OBR-SWMS-0070-AU · Rev A · HRCW

Bulk Earthworks

$19.90View →
OBR-SWMS-0071-AU · Rev A

Dewatering

$19.90View →
OBR-SWMS-0072-AU · Rev A

Shoring and Retention Systems

$19.90View →
OBR-SWMS-0073-AU · Rev A

Rock Excavation

$19.90View →
OBR-SWMS-0074-AU · Rev A · HRCW

Soil Stabilisation

$19.90View →
OBR-SWMS-0075-AU · Rev A · HRCW

Underground Services Pipe Laying

$19.90View →
OBR-SWMS-0076-AU · Rev A · HRCW

Pits and Manholes Construction

$19.90View →
OBR-SWMS-0077-AU · Rev A · HRCW

Culvert Installation

$19.90View →
OBR-SWMS-0078-AU · Rev A · HRCW

Trenchless Pipe Installation

$19.90View →
OBR-SWMS-0079-AU · Rev A · HRCW

Kerb and Channel Construction

$19.90View →
OBR-SWMS-0080-AU · Rev A · HRCW

Asphalt Paving

$19.90View →
OBR-SWMS-0081-AU · Rev A · HRCW

Spray Sealing

$19.90View →
OBR-SWMS-0082-AU · Rev A · HRCW

Line Marking

$19.90View →
OBR-SWMS-0109-AU · Rev A · HRCW

Road Profiling and Milling

$19.90View →
OBR-SWMS-0111-AU · Rev A · HRCW

Tip Truck and Trailer Operations

$19.90View →
OBR-SWMS-0112-AU · Rev A · HRCW

Chain Trencher Operations

$19.90View →
OBR-SWMS-0117-AU · Rev C · HRCW

Sheet Piling

$19.90View →
OBR-SWMS-0118-AU · Rev C · HRCW

CFA and Bored Piling Rig Operations

$19.90View →
OBR-SWMS-0119-AU · Rev A · HRCW

Driven Piling

$19.90View →
OBR-SWMS-0120-AU · Rev A · HRCW

Screw Pile Installation

$19.90View →
OBR-SWMS-0121-AU · Rev A · HRCW

Pile Cropping and Cutting Down

$19.90View →
OBR-SWMS-0122-AU · Rev C · HRCW

Pile Load Testing

$19.90View →
OBR-SWMS-0124-AU · Rev C · HRCW

Secant and Contiguous Pile Wall Construction

$19.90View →
OBR-SWMS-0129-AU · Rev A · HRCW

Pipe Relining and Pipe Bursting (trenchless rehabilitation)

$19.90View →
OBR-SWMS-0133-AU · Rev A · HRCW

Tunnelling and Underground Excavation Works

$19.90View →
OBR-SWMS-0135-AU · Rev C · HRCW

Pipeline Construction (welded steel and HDPE)

$19.90View →
OBR-SWMS-0149-AU · Rev B · HRCW

Bridge Deck and Superstructure Works

$19.90View →
OBR-SWMS-0176-AU · Rev A · HRCW

Lift Installation — Guide Rails, Landing Doors and Sills

$19.90View →
OBR-SWMS-0267-AU · Rev A · HRCW

Guardrail and Wire Rope Barrier Installation

$19.90View →
OBR-SWMS-0270-AU · Rev B · HRCW

Road Signs and Street Furniture Installation

$19.90View →
OBR-SWMS-0271-AU · Rev A · HRCW

Working in or near Rail Corridors

$19.90View →
OBR-SWMS-0273-AU · Rev B · HRCW

Marine Structures Construction (wharves, jetties, pontoons)

$19.90View →
OBR-SWMS-0275-AU · Rev B · HRCW

Bridge Jacking and Bearing Replacement

$19.90View →
OBR-SWMS-0276-AU · Rev B · HRCW

Noise Wall and Acoustic Barrier Construction

$19.90View →
OBR-SWMS-0278-AU · Rev A · HRCW

Roadside Vegetation and Slope Mowing

$19.90View →
OBR-SWMS-0282-AU · Rev B · HRCW

Load Restraint and Road Transport of Materials

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page