Sector pack · 300 Australia-wide SWMS

Fit-Out

24 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

SEC-FITOUT24 SWMS593 pages14 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
Licensed accessincluded with Company ($299/month) · Builder Pro ($129/month) carries up to 100 SWMS of your choice
Plasterboard Installation SWMS cover
Plasterboard Installation — one of the 24 SWMS in this pack

What is in the pack

OBR-SWMS-0007-AU · Rev A

Plasterboard Installation

$19.90View →
OBR-SWMS-0012-AU · Rev A

Interior Painting

$19.90View →
OBR-SWMS-0017-AU · Rev A

Wall and Floor Tiling

$19.90View →
OBR-SWMS-0021-AU · Rev A

Partition Framing

$19.90View →
OBR-SWMS-0022-AU · Rev A

Rendering

$19.90View →
OBR-SWMS-0039-AU · Rev A · HRCW

Roof Tiling

$19.90View →
OBR-SWMS-0087-AU · Rev A · HRCW

Glazing and Facade Installation

$19.90View →
OBR-SWMS-0088-AU · Rev A · HRCW

Insulation Installation

$19.90View →
OBR-SWMS-0090-AU · Rev A

Flooring Installation

$19.90View →
OBR-SWMS-0091-AU · Rev A

Joinery, Doors and Cabinet Installation

$19.90View →
OBR-SWMS-0176-AU · Rev A · HRCW

Lift Installation — Guide Rails, Landing Doors and Sills

$19.90View →
OBR-SWMS-0183-AU · Rev C · HRCW

Ceiling and Roof Space Access (all trades)

$19.90View →
OBR-SWMS-0218-AU · Rev C · HRCW

Mechanical Pipework and Duct Insulation

$19.90View →
OBR-SWMS-0229-AU · Rev C · HRCW

Exterior Painting

$19.90View →
OBR-SWMS-0244-AU · Rev C · HRCW

Waterproofing and Tanking

$19.90View →
OBR-SWMS-0245-AU · Rev C · HRCW

Suspended Ceiling Grid and Tile Installation

$19.90View →
OBR-SWMS-0246-AU · Rev C · HRCW

Access Flooring Installation

$19.90View →
OBR-SWMS-0247-AU · Rev C

Glazed Partition Installation

$19.90View →
OBR-SWMS-0248-AU · Rev C · HRCW

Signage Installation

$19.90View →
OBR-SWMS-0250-AU · Rev C · HRCW

Fire-rated Intertenancy Wall Construction

$19.90View →
OBR-SWMS-0251-AU · Rev C

Operable and Acoustic Wall Installation

$19.90View →
OBR-SWMS-0270-AU · Rev B · HRCW

Road Signs and Street Furniture Installation

$19.90View →
OBR-SWMS-0276-AU · Rev B · HRCW

Noise Wall and Acoustic Barrier Construction

$19.90View →
OBR-SWMS-0299-AU · Rev B

Industrial and Commercial Kitchen Fit-out

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page