Sector pack · 300 Australia-wide SWMS

High-Rise & Structures

39 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

SEC-HR39 SWMS1051 pages30 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
Licensed accessincluded with Company ($299/month) · Builder Pro ($129/month) carries up to 100 SWMS of your choice
Concrete Placement and Finishing SWMS cover
Concrete Placement and Finishing — one of the 39 SWMS in this pack

What is in the pack

OBR-SWMS-0010-AU · Rev A

Concrete Placement and Finishing

$19.90View →
OBR-SWMS-0036-AU · Rev A · HRCW

Formwork

$19.90View →
OBR-SWMS-0037-AU · Rev A · HRCW

Concrete Pumping

$19.90View →
OBR-SWMS-0050-AU · Rev A · HRCW

Mast Climber Operations

$19.90View →
OBR-SWMS-0053-AU · Rev A · HRCW

Precast and Tilt-up Concrete Erection

$19.90View →
OBR-SWMS-0054-AU · Rev A · HRCW

Structural Steel Erection

$19.90View →
OBR-SWMS-0055-AU · Rev A

Post-Tensioning

$19.90View →
OBR-SWMS-0056-AU · Rev A · HRCW

Jumpform Operations

$19.90View →
OBR-SWMS-0057-AU · Rev A · HRCW

Slipform Operations

$19.90View →
OBR-SWMS-0058-AU · Rev A

Falsework and Temporary Support Installation

$19.90View →
OBR-SWMS-0059-AU · Rev A · HRCW

Structural Alterations

$19.90View →
OBR-SWMS-0060-AU · Rev A

Structural Strengthening

$19.90View →
OBR-SWMS-0061-AU · Rev A

Concrete Repair and Injection

$19.90View →
OBR-SWMS-0062-AU · Rev A

Grouting Operations

$19.90View →
OBR-SWMS-0063-AU · Rev A

Shotcrete - Sprayed Concrete

$19.90View →
OBR-SWMS-0064-AU · Rev A

Concrete Grinding and Polishing

$19.90View →
OBR-SWMS-0069-AU · Rev A

Expansion Joint Installation

$19.90View →
OBR-SWMS-0113-AU · Rev A · HRCW

Mobile Crushing and Screening Plant

$19.90View →
OBR-SWMS-0131-AU · Rev A · HRCW

Ground Improvement (dynamic compaction and vibro stone columns)

$19.90View →
OBR-SWMS-0132-AU · Rev A · HRCW

Concrete Pavement Construction (slipform paver)

$19.90View →
OBR-SWMS-0138-AU · Rev B · HRCW

Suspended Slab Formwork — Conventional

$19.90View →
OBR-SWMS-0140-AU · Rev B · HRCW

Modular Deck Formwork Systems (table and flying forms)

$19.90View →
OBR-SWMS-0141-AU · Rev B · HRCW

Formwork Stripping and Back-propping

$19.90View →
OBR-SWMS-0142-AU · Rev B · HRCW

Stair Construction (in-situ and precast flights)

$19.90View →
OBR-SWMS-0144-AU · Rev B · HRCW

Crane Loading Platforms (install, use and removal)

$19.90View →
OBR-SWMS-0146-AU · Rev B · HRCW

Reinforcement Fixing — Suspended Elements (beams, columns, walls, slabs)

$19.90View →
OBR-SWMS-0150-AU · Rev B · HRCW

On-site Precast and Tilt-up Panel Casting

$19.90View →
OBR-SWMS-0153-AU · Rev B · HRCW

Industrial Floor Slab Construction (laser screed)

$19.90View →
OBR-SWMS-0156-AU · Rev B · HRCW

Tower Crane Erection, Climbing and Dismantling

$19.90View →
OBR-SWMS-0166-AU · Rev B · HRCW

Material Hoist Operations

$19.90View →
OBR-SWMS-0175-AU · Rev B · HRCW

Lift Installation — Shaft Access and Working in the Shaft

$19.90View →
OBR-SWMS-0176-AU · Rev A · HRCW

Lift Installation — Guide Rails, Landing Doors and Sills

$19.90View →
OBR-SWMS-0177-AU · Rev C · HRCW

Lift Installation — Car, Machine and Components

$19.90View →
OBR-SWMS-0178-AU · Rev A · HRCW

Lift Installation — Electrical, Testing and Commissioning

$19.90View →
OBR-SWMS-0185-AU · Rev C · HRCW

Telecommunication Tower Climbing and Rigging

$19.90View →
OBR-SWMS-0226-AU · Rev C · HRCW

Louvres, Sunshades and Screens Installation

$19.90View →
OBR-SWMS-0241-AU · Rev C · HRCW

Stair and Balustrade Installation (timber and steel)

$19.90View →
OBR-SWMS-0253-AU · Rev C · HRCW

Mezzanine Floor Installation

$19.90View →
OBR-SWMS-0293-AU · Rev A · HRCW

Residential Waffle Pod Slab Construction

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page