Sector pack · 300 Australia-wide SWMS

Mechanical & HVAC

14 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

SEC-MECHANICAL14 SWMS320 pages13 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
Licensed accessincluded with Company ($299/month) · Builder Pro ($129/month) carries up to 100 SWMS of your choice
Plant Room Rigging and Mechanical Plant Lifting SWMS cover
Plant Room Rigging and Mechanical Plant Lifting — one of the 14 SWMS in this pack

What is in the pack

OBR-SWMS-0170-AU · Rev B · HRCW

Plant Room Rigging and Mechanical Plant Lifting

$19.90View →
OBR-SWMS-0173-AU · Rev A · HRCW

Escalator and Moving Walk Installation

$19.90View →
OBR-SWMS-0175-AU · Rev B · HRCW

Lift Installation — Shaft Access and Working in the Shaft

$19.90View →
OBR-SWMS-0176-AU · Rev A · HRCW

Lift Installation — Guide Rails, Landing Doors and Sills

$19.90View →
OBR-SWMS-0177-AU · Rev C · HRCW

Lift Installation — Car, Machine and Components

$19.90View →
OBR-SWMS-0178-AU · Rev A · HRCW

Lift Installation — Electrical, Testing and Commissioning

$19.90View →
OBR-SWMS-0214-AU · Rev C · HRCW

HVAC and Mechanical Services Installation

$19.90View →
OBR-SWMS-0215-AU · Rev C · HRCW

HVAC and Mechanical Commissioning

$19.90View →
OBR-SWMS-0216-AU · Rev C · HRCW

Refrigeration Systems and Refrigerant Handling

$19.90View →
OBR-SWMS-0218-AU · Rev C · HRCW

Mechanical Pipework and Duct Insulation

$19.90View →
OBR-SWMS-0219-AU · Rev C · HRCW

Cooling Tower Installation and Maintenance

$19.90View →
OBR-SWMS-0222-AU · Rev C · HRCW

Hydronic and Underfloor Heating Installation

$19.90View →
OBR-SWMS-0290-AU · Rev B · HRCW

Conveyor System Installation

$19.90View →
OBR-SWMS-0302-AU · Rev C

Pressure Testing of Pipework, Vessels and Systems (hydrostatic and pneumatic)

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page