Sector pack · 300 Australia-wide SWMS

Plumbing & Fire

12 controlled Australia-wide SWMS in one download — every one on the current Obras Master, gated, visually passed and frozen.

SEC-PLUMBING12 SWMS280 pages10 HRCW
RELEASED — every SWMS in this pack is a released controlled revision.
Licensed accessincluded with Company ($299/month) · Builder Pro ($129/month) carries up to 100 SWMS of your choice
Roofing and Roof Plumbing SWMS cover
Roofing and Roof Plumbing — one of the 12 SWMS in this pack

What is in the pack

OBR-SWMS-0038-AU · Rev A · HRCW

Roofing and Roof Plumbing

$19.90View →
OBR-SWMS-0206-AU · Rev C · HRCW

Plumbing Installation (rough-in and fit-off)

$19.90View →
OBR-SWMS-0207-AU · Rev C · HRCW

Gas Fitting and Appliance Installation

$19.90View →
OBR-SWMS-0208-AU · Rev C

Hot Water System Installation

$19.90View →
OBR-SWMS-0209-AU · Rev C · HRCW

Elevated Pipework Installation

$19.90View →
OBR-SWMS-0210-AU · Rev C · HRCW

Fire Protection and Sprinkler Installation

$19.90View →
OBR-SWMS-0211-AU · Rev C · HRCW

Fire Hydrant and Booster System Installation

$19.90View →
OBR-SWMS-0212-AU · Rev C · HRCW

Fire Detection and Alarm Systems Installation

$19.90View →
OBR-SWMS-0218-AU · Rev C · HRCW

Mechanical Pipework and Duct Insulation

$19.90View →
OBR-SWMS-0220-AU · Rev C · HRCW

Medical Gas Installation

$19.90View →
OBR-SWMS-0222-AU · Rev C · HRCW

Hydronic and Underfloor Heating Installation

$19.90View →
OBR-SWMS-0302-AU · Rev C

Pressure Testing of Pipework, Vessels and Systems (hydrostatic and pneumatic)

$19.90View →

Which jurisdiction?

One national core; the jurisdiction is resolved on every cover from the Obras jurisdiction library (JL-1).

QLDNSWVICWASATASACTNTCTH

Inside every SWMS

  • the activity broken into steps, in the order the work happens
  • hazards identified against each step, controls set out in the order of the hierarchy of control
  • numeric risk rating before and after controls (Obras L × C methodology)
  • high-risk construction work identified where it applies
  • plant, equipment, PPE (required / conditional / specialised), competencies, licences and permits
  • hold points, a site-specific / unexpected-hazards section and an emergency and rescue procedure matched to the principal hazard
  • jurisdictional requirements table (section 5B) — the Act, Regulation, regulator and code for the jurisdiction on the cover
  • consultation, monitoring and review sections, crew sign-on register, document number / revision / approval block and the Obras QR verification band on every page