The QR Gateway · the core of Obras Onsite

One scan from a PDF to the truth.

Every Obras Onsite document sits behind a QR gateway. A crew scans it on site and doesn't get a PDF — they get the current approved revision, its Green / Amber / Red status, who approved it, the evidence behind it, the registers it feeds and the live dashboard around it. The QR is the bridge that turns a document into an operating system.

The gateway in action

Scan it. Watch it become a decision.

One QR — current revision, evidence, register, verdict. Auto-playing, no sign-up.

Scan

Scan the QR

On any Obras doc, sign or asset

Verify

Verifying…

Current? Approved? Site-specific?

Verified

Document verified

SWMS — Concrete Pour · Rev 2.1

Evidence captured · register updated
Decision
12GREEN
3AMBER
1RED

Cleared to proceed

Level 14 pour — all controls met

  • 1ScanThe QR on the deck — phone camera, no app.
  • 2VerifyObras checks it's current, approved and site-specific.
  • 3Capture & recordEvidence captured, the register updates itself.
  • 4DecideIt rolls to one verdict: Green, Amber or Red.
This one is real — scan it right now Point your phone camera at it. It opens the live control gateway for DCB-001 · Daily Control Board — current revision, status, evidence. No app, no sign-up.

Why QR verification matters

A printed document is out of date the moment it leaves the printer. A scanned document tells you the truth, every time.

Traditional documents

  • Printed
  • Outdated the moment it’s issued
  • No visibility of status
  • Built off a superseded sheet
  • Evidence assembled the night before audit
vs

Obras QR verification

  • Scan
  • Verify — current approved revision
  • Green / Amber / Red status
  • Evidence, registers, dashboard
  • Decision — proceed, review or stop

The QR workflow

Document → QR → Gateway → Operating System. Every product, every division, the same chain.

01
Document
SWMS, drawing, ITP, permit, register — any controlled doc
02
QR Code
Printed on every document, scannable at the point of work
03
Gateway
Resolves to the live control record — not a PDF
04
Current Revision
Green current, Red superseded — never build off the wrong sheet
05
Approval & Evidence
Approved by, date, sign-offs, inspection records, photos
06
Register & Dashboard
Linked registers and the live Green/Amber/Red board
07
Operating System
One verified source of truth, deck to boardroom

What a scan shows you

The QR doesn’t open a file. It opens the live control record around it.

✓ GREEN · CURRENT

Pre-Pour Gate System

HSD-PPG · Rev A · v1.0
StatusCurrent · approved
Current revisionRev A
Approval dateOn issue (controlled)
Approved byStructural Foreman / Engineer
Hold pointsReo · Form · Survey · Sign-off
EvidencePhotos · cylinders · ITP
RelatedPour Order · Reo · Concrete
Green / Amber / RedOne verdict: proceed, review, or stop — do not use.
Current revisionThe approved rev, with a superseded warning if you’re behind.
Approval & sign-offApproved by, date, and the sign-off chain.
Evidence photosConcealed services, inspections and pour records attached.
Inspection recordsITP status, witness and hold points, NCRs.
Hold pointsWhat’s open and blocking work, with the owner.
Register linksThe live registers the document feeds.
Dashboard linksStraight to the Control Room board around it.
Version historyEvery revision — what changed, when, by whom.
Related documentsThe connected controls in the same system.
▤ Scan this live gateway →

QR-verified in every division

The same gateway sits behind every product, across all five divisions. Scan. Verify. Control.

Compliance
Commercial
Residential
High-Rise
Leadership

Where this goes

QR is the bridge that moves Obras Onsite from a document seller into a software platform.

1
Document LibraryControlled documents, built by construction professionals.
2
QR SystemEvery document verified at the point of work — Green/Amber/Red.
3
Dashboard SystemRegisters and Control Rooms rolled to one daily verdict.
4
Construction Operating SystemOne verified source of truth that runs the job, deck to boardroom.

Scan. Verify. Control.

Put the QR gateway over your own job. Every drawing, SWMS, permit and register becomes one verified Green / Amber / Red decision at the point of work — on top of the systems you already use.

▶ See it run Scan a live gateway Enterprise licensing